Count the fish that crosses a few lines, balance each district, and check every surprise in the field.
Enumerators count fish vehicles at cordon gates on sampled shifts, the Directorate sets each district's production against its flows every month, and district officers investigate anything that doesn't add up.
Four steps, three people
Today, and with Fish Balance
What the Department asked for, and where to see it
| The challenge asks for | What Fish Balance does | |
|---|---|---|
| Combine production estimates with market and landing volumes, not simply add them | A district balance: official production + observed inflows − observed outflows, set against expected consumption. Arrivals check the figure; they are never added to it. | See it |
| Origin–destination information and transport/wholesale sentinel points | Cordon gates around the State and around Guwahati, counted on sampled shifts. Roadside interviews give an origin–destination table each month. | See it |
| Seed/fingerling, feed and price indicators | A seed ceiling on pond production and farm-gate against wholesale prices, shown beside each district's balance. Feed sales can be added the same way. | See it |
| Flag inconsistencies for field verification, without altering the official figure | Flags open cases sent to the District Fishery Development Officer. The production figure is read-only in the system. | See it |
| An explainable reconciliation trail | Every case keeps its frozen figures, context, field report, extra counts and decision. Closed cases form a validation annex. | See it |
How the numbers are made, and how false alarms are kept down
Each gate is a line. Each vehicle that crosses it on a sampled shift is counted once by type; about one in three is stopped for origin, destination, packing and load. Shift totals are scaled to the month.
District Apparent = Official production + Inflows − Outflows
Flag Apparent outside Expected × (1 ± band) · band set by the Directorate (25% to start)
| Rule | Starting value | Why |
|---|---|---|
| Origin confidence | Documented (slip or challan photographed), Declared (driver's word, packing fits), Inferred | Imported and Assam fish are separated with an honest margin, not a guess |
| Double counting | Count only where a vehicle crosses a ring; markets inside a ring give prices, not volumes | A crate passing through two markets inside the ring is counted once |
| False alarms | A flag needs the gap to exceed both the band and the flows' own 95% interval | A gap that sampling error could explain doesn't go to the field |
| Coverage gaps | Each case lists which gates and hours were counted | Many flags turn out to be routes or hours nobody counted |
| Seed ceiling | Fingerlings stocked × generous survival × generous harvest weight | A pond figure above the ceiling needs a reason |
| The official figure | Read-only | Revisions go through the estimation protocol, never through this system |
Starting values for the pilot. The band, shift numbers and survival assumptions will be set with the Directorate's statisticians after the first quarter's counts.
A shift at a gate
A flag, from first sight to decision
Built on the platform we already run
Roles, offline field apps, approvals, case workflows and notifications already run in production in Vrixaa Connect, our live platform. Fish Balance adds the gate sampling, the balance engine and the case trail. It can be hosted on the State Data Centre or a MeitY-empanelled cloud.
Access by role
Enumerators see their shifts, district officers their district's cases, the Directorate everything. Sign-in by OTP.
Nothing is overwritten
Counts, reports and decisions are logged with who, when and where. A correction creates a new version, and case figures stay frozen.
No trader registration
Vehicles are counted by type; interviews record origin and load, not names. Number plates are not stored.
Data stays with the Department
Hosted in India and exportable at any time. The only personal data is staff names and phone numbers (DPDP Act 2023).
What we'll settle with the Department in the first three weeks
The design follows the challenge statement and the Directorate's listed inputs. These are the points we'll agree with the Directorate and two district offices before building the production system.
- The pilot: two or three consumption centres, their main corridors, and the production districts linked to them.
- Where gates can sit safely, at halts vehicles already make, and the arrangements needed with transport and market bodies.
- The form of the district production series, and how often it is updated.
- Which seed, feed and price records exist by district, and how far back.
- The consumption assumption and band the Directorate is comfortable with.